NSN Lookup

Premium Information is available for this item - Upgrade for $1 a day

4920-00-006-0883

INTERFACE DEVICE ADAPTER ASSEMBLY

4920000060883 000060883 T2578600-14

NSN 4920-00-006-0883 4920000060883 000060883 ADAPTER ASSEMBLY,INTERFACE DEVICE

NSN Lookup Drawings and Photos 4920-00-006-0883

NSN Lookup Marketplace 4920-00-006-0883

Need Help?
Request a Quotation from participating marketplace vendors

NSN Lookup Restrictions 4920-00-006-0883

DEMIL: A | DEMILI: 1 | CRITICALITY: X | HMIC: N | PMIC: U | EDC: | ADPEC: 0

IUID Required

4920-00-006-0883 is a ADAPTER ASSEMBLY,INTERFACE DEVICE. that does not have a nuclear hardened feature or any other critical feature such as tolerance, fit restriction or application. Demilitarization of this item has been confirmed and is not currently subject to changes. This item is considered a low risk when released from the control of the Department of Defense. The item may still be subject to the requirements of the Export Administration Regulations (EAR) and the Code of Federal Regulations (CFR). This item is not suspected to be hazardous. The precious metals content of this item is unknown.

NSN Lookup Approved Sources 4920-00-006-0883

Part NumberManufacturerStatus
T2578600-14 33068 - TRIUMPH ACTUATION SYSTEMS - Active

NSN Lookup Management Data 4920-00-006-0883

Effective DateOrganizationUnit of IssueUnit PriceQuantity Unit Pack
Dec 2016Department of the Air Force (DF)EA Upgrade your Account Upgrade... 1

Air Force Air Force

Budget:
Y
Centrally procured equipment items. They are separate, primary end items (other than the weapon system itself) needed by a user to perform an assigned mission. They are non-expendable items (ERRC NF or ND) which are not consumed in use, and they do not lose their original identity during periods of use by incorporation into, or attachment to another assembly
Aggregation Code:
RN
GROUND SUPPORT EQUIPMENT (FSC RESIDUAL MMAC)
Price Validation Code:
V
The current standard price has been validated.
The item has been analyzed in conjunction with the Zero Overpricing Program and is in the accepted price range.
The item was procured under open competition and under the competitive arena the price is considered fair and reasonable.
ZOP or Standard price challenges are permissible but must be supported by adequate justification.